Menu

Collaborative design to achieve the goal

Co-Design to Target combines all unfinished engineering work with contract management, program control, systems and project design, configuration and data management, as well as subcontract administration. Avoid potential contract penalties by meeting product delivery deadlines. Reducing program complexity during product development significantly lowers one-time costs (shortening design time) and recurring costs (fewer parts + simplified manufacturing). Ensure that programs adhere to specifications, budget, and schedule to maintain tighter control over execution. Ensure lean development, faster product definition to enable smooth production ramp-up and increase productivity.

Key Benefits

  • Monitor status and key performance indicators in real-time to mitigate risks with full traceability of results.
  • Reduce process complexity by integrating “value creation streams.” Cascade thousands of specifications to subsystems from top-level requirements.
  • Behavioral digital mock-up (DMU) allows architects to pre-check system installation to prevent late and costly corrective actions.
  • Implement improvements in system installation using 3D design based on requirements, accelerating harness definition and subsequent installation.
  • Ensure continuous verification at the design stage with functional DMU for early system validation.